cut more scrap wood up tonight for next fire.
feeling a little overwhelmed but toughing it out. insulation, wiring, get lift in, place shop. 2nd spray foam guy over today for measurement. buffalo foam board guy has a bunch of 2nd 2" left. be another 6-700 in materials and id have enough for 3" roof 2" ceiling. total cost under 2k comparted to 10-15k spray.
need to research vapor barrier and whats up with my install if any issues to just slap board up and go. lots of shit info on web thats confusing.
running wire in conduit? thhn stranded or solid? 10gage white, red, green for 220 welder outlets, lift power, compressor powers. 12gage white, black, green for lights, regular power outlet. all panel breakers are 220 30amp or 120 20amp. steel EMT, steel boxes ect. 1/2" and 3/4" EMT throughout. JJ approved of my 100amp sub install.