Really good progress this weekend.
Keith came out and helped Friday night and then saturday along with the Wingman.
Kicked out a bunch of work.
Front and rear shock mounts are done.
Front shocks and coils along with retainers are installed.
Radiator, shroud and fan are all mounted and ready for coolant and power.
Rear bump stops are complete
All cage and structural tube work is complete minus corner braces around windshield opening.
To do list:
Fuel lines
Complete Fuel cell mount
Fabricate new front brake lines
Install new front brake calipers and rotors
Install new front brake hoses
Fabricate new rear hard brake line to 8.8 axle
Drill and tap axle housing for new vent location (existing was under bump stop pad. Welded shut)
Install 4:88 gears (Prob not gonna happen)
Install AUSSIE LOCKER
charge shocks
Install cherry bomb and support hanger
Run new battery cable to rear mounted battery
Limit straps (cheap insurance)
Bolt doors
Install Window net
Mount fenders (Prob not)
Mount bed sides ( Prob not)
Front and rear bumpers (would be nice)