so i have an offer to rent my scissors lift for 250$ for 2 weeks delivered. i think this might make me forge on this project. would be sick to roll up with the ram, drop the fork truck then drop the lift, hook lift and drive away in 20 min or so. i have some time this week so i think i can make it happen. Mike and I threw some ideas around. i think its some steel, cable, pulleys, some weld and fab away from happening.