Link parts are here. Talked with Mike Catrini (local guy, some association with Miller Motorsports). Decided to enlist his help with the suspension geometry. He needs to come visit though, and the current situation is putting a bit of a damper on that.
Ordered a 5 gallon Jaz vertical fuel cell and 3 core alum TJ radiator with built in shroud and 16" electric fan.
Underestimated tube usage, need a couple more sticks.
Drivetrain disconnect parts are fully machined and mounted, ready for welding. Still need to mount fork housing and adapt it for cable actuation. Seats are being raised about 2" over what they were before.