core estimate at $900 out the door. bah. prob end of week to have it built by their supplier and put together.
They'll tear it apart tomorrow, I'll take care of any frame issues if any of the corrosion around the bottom is true rot. He was pretty excited to hear that instead of having to wait on shipping that around, which strikes me a good people to work with. I guess they don't do fab work in-house which I found a little surprising.
I forgot to grab the hard pipes from the truck. I should block off the air and water connections anyway, I'll have to swing down to the shop tonight to do that and I'll grab the hard pipes. Hopefully all the crusties on those are unimportant. The rubber hoses I took apart were all in great shape.
I think if I'm a smart man, I'll pull the HVAC cores and condensor and have those all checked over and cleaned up, and see about getting lines made and blah blah blah ready for AC and having good heat on the water side of things even if the air side of things still needs work. Coordinated attack and proper order of operations!