Ready for flooring on the door ramp from the cab. All designed, hinges cut. Ready for fasteners to arrive. Need to make up a support cable and a bracket for it.
I think I want to use that diamond plate aluminum from the kitchen hauler if it’s still available. 20-22†span 38†wide should be good I think I think.
Collapsible stairs arrive tomorrow, fasteners Friday. Still need latches to secure things for transport.
I don’t have a weekend, but could still wrap up with time to spare for rolling w _IF_ I can figure out legs for the big deck. I have 2 load locks for interim legs on the front part, so at least I’ll have the front part done.
So much claptrap. Hope it seems good when it’s done.
Sent from my iPhone using Tapatalk