40 minute commute eats time is the only update on that yet.
hope to address a lot of deferred maintenance starting tomorrow. will be WFH the end of this week. Have some wrap-up of kitchen/dining room paint, check LF axle in the wagon, fix a grill and fan rattle on the allroad after hitting that dog, eventually everything needs oil changes, look at the plow truck transmission leak and exhaust, put the shelves together for real, maybe find a tub I can put under the engine stand for block cleaning. parts washer and diesel should do nice to flush it out, but I need to catch it. Still need to unload the actual hoe from the trailer. It's going to block parts of the shelves so I need to do things in the right order.
Need to fix my 3 phase too.
It should be a good long weekend.