Suspension hung and axle casings are mounted..
Rear axle is in and ready to accept wheels and tires..
Hit a wall rebuilding the knuckles, lacking a handful of 7/16 BSF threaded nuts...
would love to get the front buttoned up this week and have a roller..
Engine parts arrived.. and don't you know the stock grind from Sealed Power is NLA..
went with a 252 comp cam...
haven't had much luck with aftermarket grinds... but all those engines were FI...
here's to sticking with a carb
minus