All wiring complete. New plug wires and heat shield boots installed, (required when using headers). Electric wiper conversion complete. Dash back together.
New hood springs installed. need to repair hood latch mechanism. bent and missing latch springs...
Waiting for PCM to come back.
Next on the list is: install coolant expansion tank, fab air intake.
Engine should be ready to fire.
Started on Air Ride plumbing.
Every time i scratch something off the list, i think of ten other things i need to do..
But going to keep pushing hard to get this done for spring/summer debug.