front 60 complete tear down and inspection, new yoke, new pinion seal, re assembled
rear 14 torn down- needs new shafts and a pinion seal
skid plate removed, new bolt on plate fabricated and installed
front limit straps completly changed, link mounts and chassis mounts fabricated, new straps installed
steering filter changed
front steering links removed, ready for new heims and hardware
broken sway bar arms pulled and new arms awaiting new hardware
driveshaft inventory taken and new parts needed to be ordered
fresh radiators and fuel system inspection are next big items, water pump gaskets and tool storage / spare shaft storage.